When I first read the title my brain interpreted it as they had used a sixteen bit index for regions or something dumb like that. No, they actually literally ran out of hardware.

I was wondering if they were actually moving regions to the cloud. I figured it would be the hardest part, since the regions are already basically a private proprietary cloud.

And so far I guess they haven't figured it out yet.
They have been moving a lot of our work stuff to "the cloud" at work. As near as I can tell, it means taking our own company private cloud, and putting it inside someone else's cloud. The idea being to get rid of "white floor space", which is expensive to maintain.
 

Katheryne Helendale

🐱 Kitty Queen 🐱
Joined
Sep 20, 2018
Messages
10,369
Location
Right... Behind... You...
SL Rez
2007
Joined SLU
October 2009
SLU Posts
65534
Time to fire up some more Hyper-V instances?

Or, like Free said, to the cloud!
 

Argent Stonecutter

Emergency Mustelid Hologram
Joined
Sep 20, 2018
Messages
7,361
Location
Coonspiracy Central, Noonkkot
SL Rez
2005
Joined SLU
Sep 2009
SLU Posts
20780
They have been moving a lot of our work stuff to "the cloud" at work. As near as I can tell, it means taking our own company private cloud, and putting it inside someone else's cloud. The idea being to get rid of "white floor space", which is expensive to maintain.
At my last job we worked on moving as many servers as we could to the cloud and ended up largely pulling back... it would have cost way more than the savings from even shutting the whole thing down, unless we wanted to radically reduce the performance delivered to our developers and testers (who were always calling for upgrades as it is). Some of the hardware moved with no problem because they were serving much more conventional requirements.

Linden Lab has a similar situation, I suspect. Asset servers and other systems that are effectively webservers can move easily. The simulators will require more work to make them cloud-friendly.
 

Innula Zenovka

Nasty Brit
VVO Supporter 🍦🎈👾❤
Joined
Sep 20, 2018
Messages
23,639
SLU Posts
18459
I thought they migrated their hosting to Amazon or something. Can't they spin up on demand servers?
As the blog post explains,
As we’ve discussed previously, Second Life is in the process of migrating from our existing dedicated servers to a cloud hosting service. That migration has already moved a number of the most important services and databases, but we are not quite ready to host simulators in the cloud. We have a crack team working on that and are making lots of progress, but there are significant changes needed to make sure that we can provide the performance, stability, and security required. When that process is complete we will have a nearly unlimited region capacity, but until then we are constrained by the size of our existing server fleet.

While our migration project has been underway for some time, even our most optimistic business projections did not anticipate a surge of the magnitude we have seen in recent weeks for additional regions. While we planned for growth driven by improvements to Second Life and other factors, we didn't expect demand to be created by a global pandemic.

As a result, we are in the unfortunate position of hitting the maximum capacity of our “old” servers until the “new” cloud servers are fully operational.

That is, they're still in the process of migrating to the cloud and the unexpected growth in business because of the pandemic meant they ran though their remaining server space a lot more quickly than expected.
 
  • 1Like
Reactions: Noodles

Innula Zenovka

Nasty Brit
VVO Supporter 🍦🎈👾❤
Joined
Sep 20, 2018
Messages
23,639
SLU Posts
18459
Was gonna grab a region. I guess I will be waiting. And will happily pass on buying mainland
You can always try buying one that's no longer wanted by the owner -- that's what I've always done and paid for it to be renamed and moved if necessary -- generally far cheaper than paying the set-up fee for a new one.
 

Noodles

The sequel will probably be better.
Joined
Sep 20, 2018
Messages
5,832
Location
Illinois
SL Rez
2006
Joined SLU
04-28-2010
SLU Posts
6947
At my last job we worked on moving as many servers as we could to the cloud and ended up largely pulling back... it would have cost way more than the savings from even shutting the whole thing down, unless we wanted to radically reduce the performance delivered to our developers and testers (who were always calling for upgrades as it is). Some of the hardware moved with no problem because they were serving much more conventional requirements.

Linden Lab has a similar situation, I suspect. Asset servers and other systems that are effectively webservers can move easily. The simulators will require more work to make them cloud-friendly.
Yeah, there are a lot of things with work I don't get. One, it doesn't affect what I do, but they are talking about proprietary customer data and all that a lot. Feels like something they would want to keep in house. Maybe they are. Two, they were moving some stuff we use internally I think. Except the corporate LAN is fucking awful. Like, 1mbps DSL awful. We run like half the damn internet, our corporate LAN should be awesome. Third, for a while there was all this talk about building and being a competitor to stuff like Amazon and Microsoft for providing Cloud as a service or whatever. I don't see that happening if it's all hosted on someone else's cloud. They have not talked about that in a few years anyway. Also, going back a bit, I am pretty sure we run a lot fo the internet backbone for the country, if not everywhere, we should be able to host out own cloud servers for ourselves and everyone and they should be super fast an accessible. But the corporate execs don't seem to want to be in the service business anymore, it's all "entertainment" that's probably going to go nowhere like the Cloud Services thing did.

Anyway, I'm ranting and bitching about work now.
 

Val

n00b!1
Joined
Sep 21, 2018
Messages
126
Location
Glasgow
Joined SLU
03/07/2017
SLU Posts
138
I would not mind buying out the mainland sim we are on as we are almost on half of it now as we cannot afford to pay for a full sim. However, I assume the lease still would be 200 quid which is a tad bit too much. I am not very surprised SL is running out of current space with server move as there is a lot of abandoned sims and I had a secret rezzing spot before renting anything for years on one of those (and I could build there, hah). It still is there, in fact. They should restructure the whole thing for full optimisation but I don't think they can without moving assets for users or users themselves.
 

Andi

Luskwood Staff
Joined
Sep 20, 2018
Messages
140
Location
Lusk
SL Rez
2009
Joined SLU
11-04-2010
SLU Posts
782
Time to fire up some more Hyper-V instances?

Or, like Free said, to the cloud!
They use a modifyied debian install which runs a custom vm solution they spun up to host each sim with.
 

Benjamin Opel

Active member
VVO Supporter 🍦🎈👾❤
Joined
Sep 20, 2018
Messages
127
Location
Manchester, UK
SL Rez
2004
Joined SLU
March, 2010
SLU Posts
225


I just checked the land store to see if they're open and ready to accept orders and it appears as if they're still out of stock of the regions - which is great news for the SL economy..
 
  • 1Thanks
Reactions: Govi

Andi

Luskwood Staff
Joined
Sep 20, 2018
Messages
140
Location
Lusk
SL Rez
2009
Joined SLU
11-04-2010
SLU Posts
782


I just checked the land store to see if they're open and ready to accept orders and it appears as if they're still out of stock of the regions - which is great news for the SL economy..
I think you are not getting whats going on, they are physically out of floor space at the data center, they ran out of hardware, there is no space to put anything even if they wanted.
 

Benjamin Opel

Active member
VVO Supporter 🍦🎈👾❤
Joined
Sep 20, 2018
Messages
127
Location
Manchester, UK
SL Rez
2004
Joined SLU
March, 2010
SLU Posts
225
I think you are not getting whats going on, they are physically out of floor space at the data center, they ran out of hardware, there is no space to put anything even if they wanted.
Oh... I may of missed that part - I thought they couldn't acquire any more servers due to demand - I didn't know it was a physical issue.